I WOULD like to congratulate everyone involved with the resurfacing of the main Poole Road in Branksome.
The work was carried out efficiently and completed on schedule with an excellent result.
By concentrating the work over 24 hours and closing the whole road to accommodate, this was completed swifter than would have occurred by doing it piecemeal.
This meant limiting disruption on the main artery road between Poole and Bournemouth.
It also coincided with the general lockdown, which helped considerably.
Michael White
Poole
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules hereLast Updated:
Report this comment Cancel