I WOULD like to congratulate everyone involved with the resurfacing of the main Poole Road in Branksome.

The work was carried out efficiently and completed on schedule with an excellent result.

By concentrating the work over 24 hours and closing the whole road to accommodate, this was completed swifter than would have occurred by doing it piecemeal.

This meant limiting disruption on the main artery road between Poole and Bournemouth.

It also coincided with the general lockdown, which helped considerably.

Michael White

Poole