RAIL passengers travelling to and from London Waterloo faced disruption earlier today.

Trains were unable to run through Woking due to a fault with the signalling system.

All lines through Working were blocked and trains were being diverted, cancelled, revised or delayed by up to 70 minutes.

Trains are now able to run, however, there are residual delays and some services may be cancelled or delayed by up to 20 minutes.

The disruption is expected to last until 3pm. 

National Rail said services from Poole, Bournemouth and Southampton went via Havant and Guildford.