Borough of Poole will be carrying out some survey work on Poole Bridge this evening from 7.30pm which will require the Poole leaf to remain down for 3 - 4 hours.

In addition to the single leaf lifting there will be a lane closure of the Hamworthy to Poole side carriageway controlled by temporary traffic lights.

Mariners have been made aware the 7:30pm lift and any lifts thereafter will be single, Hamworthy side only lifts until 11:30pm.